Iolair-Maintenance-Log
Pages
Home
Must Do
Should Do
4.17.2016
Chainplates replaced
New chain plates starboard and port. These are the old ones post die test. All locations were foam sandwiched fiberglass. They were routered out, filled with epoxy, red rolled, and rebed.
New, thicker backing plates used.
4.03.2016
2016 Launch at Hartge, moved to Jabin's in Annapolis to MYachts for mast commissioning.
4.01.2016
Transmission oil, engine oil topped off
Stern pulpit, new mast with Antal track
Newer Posts
Older Posts
Home
Subscribe to:
Posts (Atom)